The GTC-2000 sets up in a jiffy − completely on its own, without the need for an assist crane. This makes the process quick and simple. Highly efficient self-assembly, accelerated through the use of hydraulic or electrical quick couplings, optimally controlled via remote.
| A COMPREHENSIVE YET SIMPLE PROCESS The self-assembly includes all essential crane components: the two 7.5 t central ballasts, both 18.5 t crawler frames each with 1 meter wide double-grouser track shoes, 4 counterweights of 10 t each plus a base plate of 5 t as well as the second hoist. As a result, no work at height is necessary, not when attaching the crawler carriers or during the hydraulic locking of the counterweights. MINIMAL MANUAL LABOR The operator and setup team only have to take care of a very limited set of tasks, since manual work is required only for some separate fastening and securing components. The controlled self-assembly of the GTC-2000 replaces almost all manual labor and makes setup as ergonomic as possible. |
Self assembly | 1 rigger | no assist crane |